Anchor | ||||
---|---|---|---|---|
|
Figure 236 depicts the basic flow of SEAMCAT for a single thread example i.e. One event result (Ri) is calculated at a time in sequence.
Figure 236: Flow of SEAMCAT Anchor F236 F236
Each of the produced event results can be ‘processed’ by a plugin in the sense that it can make additional computation based on the event result and scenario settings. This has huge potential. Basically there is no limits to how this can be used!
Figure 237: EPP Flow in SEAMCAT Anchor F237 F237
...