Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Anchor
12.1.2
12.1.2
The progress bar (right of Figure 242) reflects the proportion of carried out events with respect to overall number of scheduled events.

Anchor
F242
F242
Figure 242: Simulation status