8.7.4 System loading
The following procedures can be used for system loading during simulation and preparation of simulation outputs.
System loading
To determine the number of active mobile stations Act_MS in the network:
- Set up:
- Â Average traffic load in terms of a predefined number of users per cluster: N_UL
-  standard deviation of log-normal shadowing σshadowing
- Â voice activity factor Act_Factor (fixed to 100%)
-  target maximum noise rise over the thermal noise in the network η_target
- Â target C/I (Eb/N0_target) to fulfill service requirement depending on configuration and mobility (provided by link level simulations)
- Â maximum transmit power of mobile station max_MS_Pw_Tx
-  power control range – MS_PC_Rang:
- Â In the case that the CDMA uplink is the victim link, add the received power from the interfering system to the thermal noise power
- For each event:
- Â put down uniformly mobile stations at pseudo-random locations across the network and distribute speed among them
- Â Add a new mobile station in the set of active users in the network
- compute average path-loss from the mobile station to the base station of each cell
- generate a log-normal pseudo-random value to add to each of the path losses to model shadow fading
- perform a pseudo-random weighted coin-toss to determine voice activity, where 1 occurs with probability Act_Factor Â
- compute required received power at the base station to meet Eb/N0_target, given interference from pre-existing mobiles and other sources ( Â and )
- compute required transmit power of the mobile station
- adjust the required transmit powers of the all existing mobile stations perturbed by addition of the new mobile station
- continue the adjustment until the convergence of power control loop is achieved. A convergence criterion could be that the variation of two consecutive transmit powers of each mobile station is within a predefined threshold.Â
- compare the number of active mobile stations, Act_MS, with N_UL
- if Act_MS ≥ N_UL terminate the addition of a new mobile station in the network
- else measure the average noise rise over the thermal noise η and compare it with the target noise rise limit η_target
- if η_target is reached, terminate the addition of a new mobile station in the network
- else add a new mobile station and go to step 2b