/
A24.1 SCENARIO OVERVIEW

A24.1 SCENARIO OVERVIEW

This section provides an example of sharing studies including an analysis of a TETRA MS interfering with an FM BS, based on the information provided in the ERC Report 104 on “Adjacent Band Compatibility Of 400 MHz TETRA And Analogue FM PMR –  An Analysis Completed Using MONTE CARLO Based Simulation Tool”. This scenario involves a population of TETRA mobile stations interfering with a victim FM base station as shown in Figure 532. In all of the simulations the victim FM system is assumed to have a 7.8 km cell radius which provides a 90 % area availability.


Figure 540: Scenario of the simulation


Figure 533 illustrates the band plan assumed for this investigation. 2 MHz of spectrum has been allocated to the up-link of TETRA and directly adjacent to this, 2 MHz has been allocated to FM.

Figure 541: Band allocations of TETRA MS and FM BS systems


The purpose of this example of simulation is to use SEAMCAT to obtain the probability of interference resulting from unwanted emissions of the TETRA Mobile Stations falling at the frequency where the FM Base Station is operating.


Related content

A24.3 ASSUMPTIONS
A24.3 ASSUMPTIONS
More like this
A24.2 CHARACTERISTICS OF THE SYSTEMS
A24.2 CHARACTERISTICS OF THE SYSTEMS
More like this
A25 Answers to the TETRA vs FM PMR example
A25 Answers to the TETRA vs FM PMR example
More like this
1.1 Background to spectrum engineering
1.1 Background to spectrum engineering
More like this
A26 List of references
A26 List of references
More like this
0 Executive Summary
0 Executive Summary
More like this